House Remodel – Post #5

End of day 2 (Oct 6) saw lots of progress including removal of inside walls, sub floor, and insulation, along with a visit by the water department due to a broken old water valve.  It is amazing how much material was in this small area.  Work was non-stop from 8:30 am until 4 pm.

Pictures from the end of the day.

Remodel_Day2_001Backyard

Remodel_Day2_007Original 1930′s foundation seen in photo

Remodel_Day2_006Looking towards 1/2 bath area – kitchen walls removed

Remodel_Day2_005Ceiling – we will have a vaulted ceiling at completion

Remodel_Day2_008End of Day 2 – Dump Run #2 ready

About Guy Banana Schilling

Lost in various realities since birth, Banana currently resides on the planet earth on the left coast of California. Professionally he has held many jobs. Currently he is the Chief Metaverse Wonk and Virtual World Evangelist for Meta Magic Studio. Personally he is a long time member of the Hash House Harriers.
This entry was posted in Remodel, Santa Cruz and tagged . Bookmark the permalink.

Leave a Reply