Day 25 of the house remodel and things are moving along real well.  The city inspector came by today and gave everything a pass on the framework and electrical.  The electrical wiring in this whole area has been upgraded and completely rewired plus we added some additional light sockets and electrical power outlets.  All the plumbing and vents have been installed.  New and improved insulation has been installed plus work on air vents in the roof /ceiling to help keep the back of the house cool during summer.

Next step starting tomorrow is the installation of sheet rock which should be done by this weekend so things are on schedule.

Remodel_Day25_001Looking up towards area above kitchen entrance

Remodel_Day25_002Rounded doorway into laundry and 1/2 bath area

As you can see in the above picture, the doorway into the laundry and 1/2 bath section of the remodel has been rounded in order to match the doorway entrance into the kitchen.

In the picture below, you can see the wiring for the light fixtures for the bay window area.  On the outside, a cooper roof will be installed over the bar window.

Remodel_Day25_003Bay Window with wiring for lighting

About Guy Banana Schilling

Lost in various realities since birth, Banana currently resides on the planet earth on the left coast of California. Professionally he has held many jobs. Currently he is the Chief Metaverse Wonk and Virtual World Evangelist for Meta Magic Studio. Personally he is a long time member of the Hash House Harriers.
This entry was posted in Remodel, Santa Cruz and tagged . Bookmark the permalink.

Leave a Reply