House Remodel – Post #14

Day 45 is today and work continues on the installation of the cherry wood cabinets.  I am really happy with them and the amount of detail that Tony puts into their installation.  The top of the cabinets will feature a crown so all the comments about the “gap” at the top are not needed.  lol

The cabinet installation should be finished by the end of work tomorrow, then comes the counter top installation, wood rafters, back splash installation, painting, flooring, fixtures and other details.  So far we are on schedule and on budget.

A couple of pics for your amusement.

Remodel_Day45_001

Remodel_Day45_002

About Guy Banana Schilling

Lost in various realities since birth, Banana currently resides on the planet earth on the left coast of California. Professionally he has held many jobs. Currently he is the Chief Metaverse Wonk and Virtual World Evangelist for Meta Magic Studio. Personally he is a long time member of the Hash House Harriers.
This entry was posted in Remodel, Santa Cruz. Bookmark the permalink.

Leave a Reply