Remodel – Phase 1

Phase 1 (October 2009 – January 2010)

Kitchen / 1/2 Bath / Laundry

Main Contractor – Armor Construction and Design (831.427.9248) website

Summary:  The back of the house includes a kitchen, 1/2 bath and laundry closet that had been remodeled in 1994 by the previous owner.  Everything needed to be ripped out and rebuilt including lowering of the floor to match the rest of the house (for some reason the kitchen was 3/4 inch higher), new vaulted ceiling, cheery wood cabinets, quartz counter top, tile and lots more.  We did not hire a designer, instead we worked with Tony on the layout and look.  Tony and his crew were great throughout the project keeping up with communications, expenses and keeping the site clean.  Plus he brought in a porta-potty which I wanted to keep at the end, though my better half over ruled that idea. :)

Kitchen from Dinning Room

Ceiling with light fixtures and skylight

1/2 Bath sink

Kitchen

Additional Phase 1 pictures

Old Kitchen

Old bathroom

Day 2

Lowering the floor to match rest of house

Fixing wood rot from old leaking dishwasher

Bracing for vaulted ceiling and new skylight